
- 2020 BMW M4 Convertible Competition
- 3.0L Twin-Turbocharged I6
- 6-Speed Manual
- RWD
- Black Sapphire Metallic Exterior
- Black Extended Merino Leather Interior
- Competition Package
- 20" M Star-Spoke Style 666M Forged Wheels
- Adaptive M Suspension
- Active M Differential
- Extended High-Gloss Shadowline Trim
- Heated Steering Wheel
- M Sport Seats
- Carbon Fiber Interior Trim
- Paint Protection Film (Front End)
The F83-generation BMW M4 Convertible perfectly blends open-air driving with true M Division performance, and this 2020 BMW M4 Convertible is an excellent example of that formula. Showing just 10,755 miles, it pairs its striking Black Sapphire Metallic finish with a Black Extended Merino Leather interior for a timeless appearance. Equipped with the coveted Competition Package and an increasingly rare 6-speed manual transmission, this M4 delivers an engaging driving experience backed by a potent twin-turbocharged inline-six and BMW's legendary chassis dynamics.
Exterior and Interior
The exterior of this 2020 BMW M4 Convertible is finished in Black Sapphire Metallic, a deep metallic finish that complements the M4's aggressive styling and muscular proportions. The Competition Package brings exclusive 20-inch M Star-Spoke Style 666M forged wheels, Extended High-Gloss Shadowline trim, and chassis enhancements that further distinguish it from the standard M4. A power-retractable hardtop transforms the car from a refined coupe to an open-top sports car in seconds, allowing drivers to enjoy every mile regardless of the season. The interior of this 2020 BMW M4 Convertible is trimmed in Black Extended Merino Leather, creating a premium cabin that is both luxurious and performance-focused. M Sport seats provide excellent support during spirited driving, while the heated steering wheel adds comfort during cooler weather. Carbon fiber interior trim reinforces the car's sporting character, and conveniences such as dual-zone automatic climate control, navigation, and the Harman Kardon surround sound system make every journey as enjoyable as it is engaging.
Engine
Powering this 2020 BMW M4 Convertible is BMW M's renowned 3.0L twin-turbocharged inline-six, producing 444 horsepower as part of the Competition Package. Paired with a 6-speed manual transmission, this M4 offers an increasingly rare level of driver involvement that enthusiasts continue to seek. An Adaptive M Suspension and Active M Differential work together to maximize grip and handling precision, while the rear-wheel-drive layout delivers the balanced dynamics that have made the M4 one of the benchmark performance cars of its era.
Inspection
The 2024 BMW M8 Competition Convertible combines the performance of BMW's M division with the refinement and open-air luxury of a flagship grand tourer. Powered by a formidable twin-turbocharged V8 and equipped with BMW's advanced M xDrive all-wheel-drive system, the M8 Competition delivers an exhilarating driving experience without sacrificing everyday comfort. This 2024 BMW M8 Competition Convertible, showing just 8,976 miles, is finished in Black Sapphire Metallic over a Silverstone Full Merino Leather interior with a Moonlight Black convertible soft top. Powered by a 4.4L twin-turbocharged V8 producing 617 horsepower, paired with an eight-speed M Steptronic automatic transmission, this example features the Driving Assistance Professional Package, 20-inch M Star-Spoke wheels, Bowers & Wilkins Diamond Surround Sound System, and neck warmer. Additional highlights include paint protection film, ceramic coating, and owner-reported protective treatments. With its elegant specification, low mileage, and impressive performance capabilities, this M8 Competition offers an exceptional combination of German engineering and open-top grand touring luxury.
Terms of Service
Be Kind and Courteous
We're here to create a platform to better the automotive industry through communication and transparency. Please treat everyone with respect. Healthy debates are natural, but kindness is required.
No Hate Speech
Make sure everyone feels safe. Hate speech of any kind is strictly prohibited. Degrading comments about things like race, religion, culture, sexual orientation, etc. will not be tolerated.
No Promotions or Spam
Give more than you take. Self-promotion, spam, or links of any kind are not allowed.


