2016 BMW M4

6-Speed Manual | Aftermarket ECU Tune | Satin Paint Protection Film

Extended Warranty
LOT #

260762463

Sports Car

Vehicle Price$44,200
Pre-Delivery Service Charge$1,299
Total Price$45,499
Advertised price includes the $1,299 Pre-Delivery Service Charge. Price does not include taxes, tag, registration, or other mandatory government charges.
Pending Sale
Estimated: $457.56/mo
Estimated payment assumes 20% down, 9.5% APR, and 120-month term. Actual rates may vary.
get pre-qualified
Get Notifications

Buyer Resources

Buying a car online before Exotic Car Trader was tedious. Our team of Car Traders will assist you each step of the way. Whether you are financing, need more information, or have a trade-in, we've got you covered. Learn How to Buy a Car Online
Listing Disclaimer:
Verified Seller provides all vehicle specific information and modifications listed below. Confirm any specifics with your Exotic Car Trader Representative prior to purchase. Sales tax or other taxes, tag, title, registration fees, government fees, not included in advertised price. $1,299 Pre-Delivery Service Charge not included in advertised price.
Make:
BMW
Model:
VIN:
WBS3R9C54GK336613
Lot Number:
260762463
Condition:
Used
Odometer:
59,424 miles
Engine:
3.0L Twin-Turbocharged I6
Drive Type:
Rear-Wheel Drive (RWD)
Transmission:
Manual/Standard
Exterior Color:
Black Sapphire Metallic
Interior Color:
Silverstone
Vinyl Wrap:
Vehicle Location:
Pennsylvania
  • 2016 BMW M4 Coupe
  • 3.0L Twin-Turbocharged I6
  • 6-Speed Manual
  • RWD
  • Black Sapphire Metallic Exterior
  • Silverstone Full Merino Leather Interior
  • Executive Package
  • Lighting Package
  • Adaptive M Suspension
  • Driving Assistance Plus Package
  • Aftermarket ECU Tune
  • ARM Downpipe
  • ARM Midpipe
  • Aftermarket Carbon Fiber Trunk Wing
  • Aftermarket Carbon Fiber Mirror Caps
  • Aftermarket Carbon Fiber Fender Vents
  • Aftermarket Carbon Fiber Steering Wheel
  • Aftermarket Carbon Fiber Hood, Trunk, Wheel & Steering Wheel Emblems
  • Aftermarket Carbon Fiber Door Handle Inlays
  • Aftermarket Carbon Fiber Parking Brake Lever
  • Aftermarket Carbon Fiber Pedals
  • Aftermarket Headlights
  • Aftermarket Taillights
  • Aftermarket Front Lip
  • Aftermarket Front Upper Splitters
  • Aftermarket Side Skirts
  • Aftermarket Rear Diffuser
  • Aftermarket Rear Bumper Splitters
  • Black Kidney Grille
  • Black M4 Emblems
  • Black Exhaust Tips
  • Blue Instrument Cluster Gauges
  • Blue Seat Belts
  • Satin Paint Protection Film
  • Tinted Tailights

Overview of 2016 BMW M4 For Sale by Owner

The 2016 BMW M4 Coupe represents the enthusiast-focused evolution of BMW’s legendary M3 lineage, combining a high-revving performance heritage with modern turbocharged power and advanced chassis technology. Showing 59,424 miles, this example is finished in Black Sapphire Metallic over a Silverstone Full Merino Leather interior and features the highly desirable 6-speed manual transmission. Enhanced with an aftermarket performance package including an ECU tune, ARM downpipe, ARM midpipe, and extensive carbon fiber upgrades, this M4 delivers a more aggressive driving experience while maintaining the balance and precision expected from BMW’s M division.

Exterior and Interior

The exterior of this 2016 BMW M4 Coupe is finished in Black Sapphire Metallic and has been further customized with a collection of carbon fiber and aerodynamic upgrades. Exterior enhancements include an aftermarket carbon fiber trunk wing, carbon fiber mirror caps, carbon fiber fender vents, front lip, front upper splitters, side skirts, rear diffuser, and rear bumper splitters. Additional styling modifications include a black kidney grille, black M4 emblems, black exhaust tips, aftermarket headlights, aftermarket taillights, tinted taillights, and satin paint protection film, creating a more aggressive and personalized appearance. The interior of this 2016 BMW M4 Coupe features a premium Silverstone Full Merino Leather interior complemented by blue seat belts and blue instrument cluster gauges. The cabin has been upgraded with aftermarket carbon fiber trim pieces including a carbon fiber steering wheel, carbon fiber door handle inlays, carbon fiber parking brake lever, carbon fiber pedals, and carbon fiber emblems throughout. Factory equipment includes the Executive Package, Lighting Package, Driving Assistance Plus Package, and Adaptive M Suspension, providing a balance of luxury, technology, and performance capability.

Engine

Power comes from BMW’s 3.0L twin-turbocharged inline-six engine paired with a 6-speed manual transmission sending power to the rear wheels. This M4 has been upgraded with an aftermarket ECU tune, ARM downpipe, and ARM midpipe to enhance performance and exhaust character. Combined with BMW’s electronically controlled chassis systems and Adaptive M Suspension, this M4 delivers the engaging rear-wheel-drive dynamics, performance, and driver involvement that define the F82-generation M4.

Walk-around Video of this BMW M4

2004 BMW 760Li

For Sale
ASK: $28,298
Miles: 50,703
Estimated: $279.49/mo

BMW's decision to equip its fourth-generation 7 Series with a twelve-cylinder engine was a statement of engineering ambition, placing the German luxury sedan among an exclusive class of flagship automobiles. Introduced in 2002, the E65/E66 generation brought revolutionary styling, the debut of BMW's iDrive interface, and an impressive collection of technological innovations that would influence luxury automobiles for years to come. At the top of the lineup sat the 760Li, combining a sophisticated 6.0L V12 with the additional rear-seat accommodations of a long-wheelbase executive sedan. This 2004 BMW 760Li Sedan, showing just 50,703 miles, comes finished in Sterling Gray Metallic over a distinctive Stone Green Nasca leather interior. Its naturally aspirated V12 produces 438 horsepower and is paired with a six-speed Steptronic automatic transmission, delivering the effortless performance expected of BMW's flagship. Particularly desirable factory options include Active Cruise Control, complemented by Dynamic Drive active roll stabilization, Electronic Damping Control, rear self-leveling suspension, and extensive premium interior appointments. With its unusual interior color combination, advanced engineering, and low mileage for its age, this 760Li offers an appealing opportunity to experience BMW's twelve-cylinder luxury motoring from an era when naturally aspirated V12 sedans occupied the pinnacle of the manufacturer's lineup.

TOP