- 2023 BMW M5 Competition
- 4.4L Twin-Turbocharged V8
- 8-Speed Automatic
- AWD
- Tanzanite Blue II Metallic Exterior
- Silverstone Full Merino Leather Interior
- Competition Package
- M Sport Exhaust System
- 20" M Y-Spoke Forged Bi-Color Wheels
- M Compound Brakes with Red Calipers
- M Shadowline Lights
- M Seat Belts
- Driving Assistance Professional Package
- Executive Package
- Bowers & Wilkins Diamond Surround Sound System
- BMW M 50 Years Emblems
Introduced in 1984, the letter-and-number pairing of M5 has sparked thrills and ignited excitement in the hearts of performance enthusiasts and BMW fans worldwide. The M5 is the halo variant of BMW’s popular 5-Series, a mid-size or executive luxury car. Availing yourself to an M5 means that you’re getting a fine driving machine with bucketloads of performance and capability, wrapped up in a spacious four-door package, and offering most, if not all, of BMW’s luxury appointments, fine finishings, and technological advancements. Today, we’ve got a 24,936-mile 2023 BMW M5 Competition Package from Illinois in our inventory. This super-sedan comes with the Driving Assistance Package, Executive Package, Competition Package, and a snarling twin-turbo V8 to behold. In short, it’s the perfect family car for a driving enthusiast with a partner and kids in tow.
Exterior and Interior
This 2023 BMW M5 Competition comes from the F90 era, which ran between 2017 and 2023. Wearing a Tanzanite Blue Metallic II paint code, this car looks breathtaking, with its 20-inch M Y-spoke forged bi-color wheels, signature BMW kidney grilles, M Shadowline headlamps with L-shaped daytime running lights, and of course, discrete M5 badging where necessary. This is a car that doesn’t need to shout potency, because it conveys it in a subtle manner. Perhaps the most significant sign of performance to the uninitiated would be the four tailpipes at the rear. The interior of this 2023 BMW M5 Competition comes in Silverstone Full Merino Leather. As you’d expect, that means soft and supple Merino leather coats the five seats, the front ones are power-adjustable, heated, and ventilated too. Then, you’ll find BMW’s signature iDrive infotainment system with Apple CarPlay and Android Auto, hooked up to a sublime Bowers & Wilkins diamond high-end speaker system. A digital gauge cluster faces the driver, who will be gripping a heated multifunction steering wheel. Four-zone climate control keeps everyone comfortable, and there are plenty of USB and USB-C charging ports too.
Engine
The 4.4-liter BMW TwinPower twin-turbo V8 under the hood of this 2023 BMW M5 Competition is an absolute beast, providing up to 617 hp and 553 lb-ft of torque in Competition Package form. Power goes to the rear wheels through a super-slick ZF 8-speed automatic gearbox with manual shifting via steering wheel-mounted paddles. The car also comes with M Compound brakes with red calipers, which are crucial when you’ve got 0-60 mph performance in the low 3-second range, and a potential unlimited top speed in excess of 200mph.
The 2010 BMW M5 is one of those cars that feels almost impossible by modern standards: a full-size four-door luxury sedan powered by a naturally aspirated V10 and sending its power to the rear wheels through a 7-speed Sequential Manual Gearbox. Showing approximately 115,170 miles, this Black Sapphire Metallic example captures everything that made the E60 M5 such an enthusiast icon. It combines genuine super-sedan performance with the comfort of Black Perforated Full Merino Leather, ventilated multi-contour front seats, soft-close doors, Head-Up Display, Comfort Access, and premium audio. Add the unmistakable 19-inch Style 166M wheels and you have a car that can blend quietly into executive traffic one moment and deliver the kind of high-revving V10 drama that few sedans before or since have ever matched.
The E39-generation BMW M5 is widely regarded as one of the greatest sport sedans ever built, striking an extraordinary balance between everyday comfort and genuine high-performance capability. Introduced as the flagship of the 5 Series lineup, it paired understated styling with a naturally aspirated V8 and a proper 6-speed manual transmission, creating a formula that enthusiasts continue to praise more than two decades later. Showing 99,352 miles, this 2002 example is finished in Titanium Silver Metallic over Extended Nappa Point Silverstone leather and is equipped with desirable factory options including Park Distance Control, a power rear sunshade, split-folding rear seats, and the Enhanced Premium Sound System. As one of the last hand-assembled M cars to feature a naturally aspirated V8 and manual gearbox, the E39 M5 remains a benchmark for performance sedans.
The one that strikes fear into many midsize or executive car makers, the BMW M5 has been setting the template for a fast family car for over forty years since the first one came out in 1984. It’s become a de facto member of the 5-Series line-up ever since, sitting at the top of the range, and offering supercar-chasing performance in a four-door package. Today’s 2022 BMW M5 Competition Package comes from Boca Raton, Florida and is from the F90 era of 2017-2023. With just 30,000 miles, this car packs the Appearance Package and was reportedly certified six months ago. If you want a family car that’s sure to knock your socks off, you can’t go wrong with a M5.
The BMW 6 Series has long occupied a special place in the German automaker's lineup, combining grand touring luxury with the performance and driving dynamics that made BMW famous. Introduced for the 2004 model year, the second-generation 6 Series marked the return of BMW's flagship grand tourer after nearly a decade, featuring distinctive styling by Chris Bangle's design team and a sophisticated V8 powertrain. This 2007 BMW 650i Convertible captures that character with its naturally aspirated 4.8L V8, six-speed automatic transmission, and power-operated convertible soft top. Showing just 48,088 miles, this example is finished in Black Sapphire Metallic over Black Dakota leather, complemented by aftermarket black multi-spoke wheels and red-painted brake calipers. With 360 horsepower on tap, seating for four, and the freedom of open-air motoring, this 650i offers an appealing combination of traditional BMW performance and refined grand touring comfort.
The 2010 BMW M5 is one of those cars that feels almost impossible by modern standards: a full-size four-door luxury sedan powered by a naturally aspirated V10 and sending its power to the rear wheels through a 7-speed Sequential Manual Gearbox. Showing approximately 115,170 miles, this Black Sapphire Metallic example captures everything that made the E60 M5 such an enthusiast icon. It combines genuine super-sedan performance with the comfort of Black Perforated Full Merino Leather, ventilated multi-contour front seats, soft-close doors, Head-Up Display, Comfort Access, and premium audio. Add the unmistakable 19-inch Style 166M wheels and you have a car that can blend quietly into executive traffic one moment and deliver the kind of high-revving V10 drama that few sedans before or since have ever matched.
The 2015 BMW i8 was one of the most futuristic performance cars of its era, combining exotic styling, carbon-intensive construction, and plug-in hybrid technology in a package that still looks remarkably modern today. Showing 28,371 miles, this example is finished in Sophisto Grey Metallic with Frozen Grey accents beneath a 3M white vinyl wrap with gold flake, paired with a Pure Impulse Carum Spice Grey full perforated leather interior. Its specification is especially notable for the Pure Impulse World Package, which adds distinctive interior and exterior details that give the car a more exclusive presentation. With its turbocharged three-cylinder engine, front electric motor, lithium-ion battery pack, and all-wheel-drive layout, this i8 remains a fascinating blend of sports-car design, advanced materials, and forward-thinking electrification.
The BMW 6 Series has long occupied a special place in the German automaker's lineup, combining grand touring luxury with the performance and driving dynamics that made BMW famous. Introduced for the 2004 model year, the second-generation 6 Series marked the return of BMW's flagship grand tourer after nearly a decade, featuring distinctive styling by Chris Bangle's design team and a sophisticated V8 powertrain. This 2007 BMW 650i Convertible captures that character with its naturally aspirated 4.8L V8, six-speed automatic transmission, and power-operated convertible soft top. Showing just 48,088 miles, this example is finished in Black Sapphire Metallic over Black Dakota leather, complemented by aftermarket black multi-spoke wheels and red-painted brake calipers. With 360 horsepower on tap, seating for four, and the freedom of open-air motoring, this 650i offers an appealing combination of traditional BMW performance and refined grand touring comfort.
The Genesis G90 represents the pinnacle of Genesis' luxury sedan lineup, combining elegant Korean craftsmanship, advanced technology, and refined performance in a flagship designed to compete with some of the world's most established luxury automobiles. Introduced as Genesis' flagship sedan, the G90 received a significant design refresh for the 2020 model year, bringing a distinctive diamond-pattern grille, sophisticated lighting elements, and an unmistakable road presence. This 2021 Genesis G90 5.0 Ultimate AWD represents the range-topping configuration, featuring a naturally aspirated 5.0L V8 producing 420 horsepower, an 8-speed automatic transmission, and all-wheel drive. Finished in Vik Black over a Black Nappa leather interior, this example comes generously appointed with 22-way power-adjustable driver's seating, heated and ventilated front and rear seats, a Lexicon 17-speaker premium audio system, and rear-seat entertainment with dual 10.3-inch displays. Showing just 26,955 miles, this G90 offers an impressive combination of traditional V8 luxury, advanced driver-assistance technology, and executive-class comfort, making it an appealing alternative to its European luxury sedan counterparts.
The 2021 Audi RS Q8 is what happens when Audi Sport applies its full performance treatment to a large luxury SUV. Showing approximately 37,946 miles, this example pairs a 4.0L twin-turbocharged V8 with an 8-Speed Tiptronic automatic and quattro all-wheel drive, giving it the kind of performance credentials more commonly associated with serious sports cars. Finished in Navarra Blue Metallic over a Cognac Valcona Leather interior with Granite Gray accents and Honeycomb Stitching, it also brings an unusually rich specification. Highlights include the Carbon Exterior Package, Full Leather Package Plus, Massaging RS Sport Seats, Bang & Olufsen Advanced 3D Sound System, and Driver Assistance Package, making this RS Q8 as compelling from the driver’s seat as it is from the outside.
Terms of Service
Be Kind and Courteous
We're here to create a platform to better the automotive industry through communication and transparency. Please treat everyone with respect. Healthy debates are natural, but kindness is required.
No Hate Speech
Make sure everyone feels safe. Hate speech of any kind is strictly prohibited. Degrading comments about things like race, religion, culture, sexual orientation, etc. will not be tolerated.
No Promotions or Spam
Give more than you take. Self-promotion, spam, or links of any kind are not allowed.


