
- 2025 BMW M3 Competition xDrive
- 3.0L Twin-Turbocharged I6
- 8-Speed M Steptronic Automatic
- xDrive AWD
- Grey Black Exterior
- Ivory White Full Merino Leather Interior
- Driving Assistance Professional Package
- Parking Assistance Package
- Executive Package
- M Drive Professional
- Carbon Fiber Trim
- Galvanic Controls
- M Carbon Bucket Seats
- M Carbon Exterior Package
- Drive Recorder
Since the first M3 was released as part of BMW’s E30 3-Series, it has become the definitive driver’s car in the compact luxury segment. Throughout the years, every 3-Series since then has had an M3 on offer, representing the very best of what BMW can offer for this popular compact luxury car model. Today’s 2025 BMW M3 Competition xDrive is from the very latest G80 generation, and it’s the hardcore Competition variant – yes, even the M3 has a harder-than-hardcore derivative now. This lovely sports sedan is up for grabs in Gainesville with under 20,000 miles on the clock. It’s got carbon-fiber interior trim, the M Carbon Exterior Package on the outside, and more.
Exterior and Interior
This 2025 BMW M3 Competition xDrive comes in a gray and black exterior, which is pretty aggressive looking from the moment you set eyes upon it. At the rear, a prominent lower diffuser houses four tailpipes, while there’s a discrete but noticeable lip spoiler. Along the sides, you’ll see typical BMW performance cues such as M Performance disc brakes behind M multi-spoke alloy wheels that are staggered bicolor units. Meanwhile, the front sports BMW’s larger-than-life kidney grille that has heavily divided opinions, but at least provides abundant cooling air for the high-performance powertrain within. LED headlamps are also standard. The Ivory White interior of this car comes with M Carbon Bucket Seats at the front, as well as Carbon Fiber interior trim. It’s got the Executive Package, M Drive Professional Package, Driver Recorder Package, Galvanic Controls Package and Driving Assistance Professional Package. There’s even the Parking Assistance Package and all the creature comforts and conveniences you’d expect. The car can seat five occupants, child seats can be strapped into the rear, and the trunk is your typical 3-Series affair. Yes, it’s pretty much as family friendly as you can get.
Engine
This 2025 BMW M3 Competition xDrive is all-wheel drive hence the xDrive moniker. It’s got a fearsome 3.0-liter straight six under the hood. That doesn’t sound much initially, but let’s talk about the twin turbos that force copious amounts of air into it. Hence, it can reportedly develop 503hp and 479lb-ft, enough for 0-60 in less than 4 seconds. A smooth 8-speed ZF automatic gearbox handles shifting, and you can take control via the paddle shifters too.
Terms of Service
Be Kind and Courteous
We're here to create a platform to better the automotive industry through communication and transparency. Please treat everyone with respect. Healthy debates are natural, but kindness is required.
No Hate Speech
Make sure everyone feels safe. Hate speech of any kind is strictly prohibited. Degrading comments about things like race, religion, culture, sexual orientation, etc. will not be tolerated.
No Promotions or Spam
Give more than you take. Self-promotion, spam, or links of any kind are not allowed.


