
- 2016 Model Year BMW M3 Sedan
- Azurite Black Metallic exterior
- Black leather interior
- 3.0L Twin Turbo I6
- 7 Speed M double clutch automatic transmission
- 19" x 9" rear and 19" x 10" front Black light alloy wheels
- Black full Merino leather upholstery
- Head up display
- Heated front and rear seats
- Rear view camera
- Park distance control
- Lighting Package
- Adaptive M Suspension
- Carbon roof
- Carbon fiber front inserts
- 2 keys
The M series by BMW is the perfect balance of that German understatedness and power that could scare some higher-end sports cars. As time goes by, the iconic M3 sees some changes to its traditional recipe but stepping into one counts for a good time, be it hugging an apex on full force or being a reliable daily. With the horsepower wars in full swing, this 2016 BMW M3 Sedan we have today can be your weapon of choice. The car has a reported 45,100 miles on the clock and comes with 2 keys included in the sale.
Exterior and Interior
While it's based on the BMW 3-Series, the M3 sports unique features to make it stand out, the beefier exterior details are brought to light with this 2016 BMW M3 Sedan and its Azurite Black Metallic exterior. Since a sports car isn't complete without some lashings of carbon fiber this German powerhouse sports carbon fiber front inserts and a carbon roof. The "M" treatment doesn't stop there; you also get lightweight black alloy wheels which are 19-inches in diameter and 9-inches wide at the front, and a steamroller-like 10-inches wide at the rear. Track days don't have to mean fun but uncomfortable time. Stepping into this 2016 BMW M3 Sedan and its black leather interior, you get the perfect mix of luxury and sports feel. The black Merino leather upholstery matches the heated front and rear seats. The car also has a heads-up display, a rear view camera, and Park Distance Control for added safety, plus the usual conveniences and tech toys.
Engine
While the humble M3 has seen some downsizing in the engine department, you won't see a drop in performance figures. In its 30+ year production run, the F80 M3 changed history by being the first M3 to sport a turbocharged engine. Powering this 2016 BMW M3 Sedan is a twin-turbocharged 3.0L inline six engine that, when new, was capable of pushing out an impressive 425 horsepower. All this power is channeled to the car's rear wheels in true M3 style through a seven-speed automatic dual-clutch transmission. With this car's adaptive M suspension, the twin-turbocharged powertrain can be pushed to the limit on corners.
Terms of Service
Be Kind and Courteous
We're here to create a platform to better the automotive industry through communication and transparency. Please treat everyone with respect. Healthy debates are natural, but kindness is required.
No Hate Speech
Make sure everyone feels safe. Hate speech of any kind is strictly prohibited. Degrading comments about things like race, religion, culture, sexual orientation, etc. will not be tolerated.
No Promotions or Spam
Give more than you take. Self-promotion, spam, or links of any kind are not allowed.


