2022 BMW M5 CS

4.4L V8 Twin-Turbo | M Sport Exhaust | M Carbon Bucket Seats

Extended Warranty
LOT #

23033930

Luxury Car

This vehicle is currently off the market.
Sign up to be notified when this vehicle or one similar is available.
More Cars for Sale >
OFF MARKET VEHICLE
All the information and photos on this listing are from when this vehicle was originally listed on ExoticCarTrader.com
Make:
BMW
Model:
VIN:
WBS73CH04NCK04732
Lot Number:
23033930
Condition:
Used
Odometer:
3,228 miles
Engine:
4.4L V8
Drive Type:
Transmission:
Automatic
Exterior Color:
Frozen Brands Hatch Grey
Interior Color:
Black
Vinyl Wrap:
Vehicle Location:
Florida

Overview of 2022 BMW M5 CS For Sale by Owner

The 2022 BMW M5 CS is a truly remarkable vehicle that boasts impressive power and performance capabilities. As the most powerful BMW to date, this sedan is a true driving machine that packs a punch with its 4.4L twin-turbo V8 engine that delivers an astounding 627 horsepower and 553 ft-lb of torque. The 8-speed automatic transmission and all-wheel drive system with 2-wheel drive capability make for an exciting and powerful driving experience, while the sedan's handling is reminiscent of a sports car. With only 3228 miles on the odometer, this BMW M5 CS is in pristine condition and offers a thrilling driving experience for anyone lucky enough to get behind the wheel.

Exterior and Interior

The exterior of the 2022 BMW M5 CS is a true reflection of the car's power and performance capabilities. Painted in a striking Frozen Brands Hatch Grey, this sedan demands attention and turns heads wherever it goes. The Carbon Ceramic Brakes, 20" Bronze Alloy Wheels, and Kidney Shaped Grille compliment the aggressive stance that is both intimidating and captivating. Sharp body lines are a prominent feature of the car's design, and they enhance the aerodynamics of the car while adding to its sporty appeal. The Carbon Fiber Rear Spoiler, Carbon Fiber Front Splitter, Carbon Fiber Roof, Carbon Fiber Side Mirrors and M Sport Exhaust are all features that speak to the car's exceptional engineering and high-performance capabilities that remind you that this is no regular M5. The exterior of the 2022 BMW M5 CS is a testament to the brand's commitment to excellence in design and performance. Stepping into the interior is an elegant, yet sporty cockpit that provides both comfort and functionality. The Black Merino Leather and Alcantara interior is both stylish and sophisticated, with M Carbon Bucket Seats featuring red accents and red stitching that add a pop of color and elevate the car's sporty appeal with the rear bucket seats to match, completing the cohesive interior design. The Anthracite Alcantara Headliner creates a sense of intimacy and adds to the overall feeling of luxury inside the car. The Harman Kardon Surround Audio System is a standout feature, providing crystal-clear sound quality that enhances the driving experience. The Alcantara Steering Wheel and Carbon Fiber Paddle Shifters provide a comfortable and responsive driving experience, while also adding to the car's high-end interior design. Overall, the interior of the 2022 BMW M5 CS is a perfect combination of sporty and luxurious features that complement each other to create an exceptional driving experience.

Engine

The 2022 BMW M5 CS is the most powerful BMW to date, packing an S63 Twin-Turbo 4.4L V8 engine that delivers an impressive 627 horsepower and 553 ft-lb of torque. The car features stiffer engine mounts compared to the regular M5, as well as stiffer suspension springs and a 0.2 inch lower ride height, all of which contribute to the car's exceptional handling and performance. The front camber has also been adjusted for a more negative angle, providing even greater stability and control. With launch control mode and a blistering 2.6 second 0-60 mph time, the 2022 BMW M5 CS is a true powerhouse that will leave drivers exhilarated and craving more.

Walk-around Video of this BMW M5

TOP