
- Alpine White Exterior
- Aragon Brown Interior
- Full Merino Leather Upholstery in Aragon Brown
- Driving Assistance Professional Package
- Executive Package
- M Compound Brakes with Red Calipers
- Bowers and Wilkins Diamond Surround Sound System
- Custom CS Style Hood reported by current owner
- Eventuri Intake and Turbo Inlets reported by current owner
Extras Included in the Sale
- Custom CS style hood
- Eventuri intake and turbo inlets
It is a fact that any car from BMW's M lineup is going to be impressive. If you’re lucky enough to be in the market for one, then it’s guaranteed that power and performance are going to be exceptional. The BMW M5 was introduced in 1985 and is currently in its seventh generation. Flaunting a design based on the regular 5-Series, the M5 is a no-holds-barred extreme sports sedan. This staggering example of the 2023 BMW M5 belongs to the sixth generation, also known as the F90. With just over 11,000 miles on the clock, this super saloon is up for grabs in Florida.
Exterior and Interior
The F90 M5 is a German muscle car with its large body, an enormous engine up front, and eye-watering handling. With this example, you can notice the wider fenders, sportier bumpers, and a custom CS-style hood. This 2023 BMW M5 is painted in a beautiful Alpine White paint job with blacked-out trim throughout the car. It sits on lowered sports suspension from the factory and is shod with gloss black 20-inch M sport alloy wheels. The M Compound Brakes with red calipers peak behind the alloys, giving the car a pop of colour. The futuristic and luxurious interior of this car features full Merino leather upholstery in Aragon Brown. Two screens display all the necessary information about the car, while the Bowers & Wilkins Diamond surround sound system caters to auditory needs. The executive package includes massaging ventilated front seats, heated seats, soft-close doors, and additional parking assistant features. The Driving Assistance Professional Package also adds extra functions.
Engine
The 2023 BMW M5 is mighty with a power output of 600HP and a tire-screeching 553 ft-lb of torque thanks to its 4.4-liter twin turbo V8 engine. When stock, this car can accelerate from a standstill to 100 km/h (62 mph) in 3.4 seconds. However, this example has Eventuri intakes and turbo inlets installed for more power and noise. This engine is mated to an 8-speed ZF automatic transmission, which delivers power to all four wheels through BMWs innovative drive system. Extra handy functions are added with the Driving Assistance Professional Package.
Terms of Service
Be Kind and Courteous
We're here to create a platform to better the automotive industry through communication and transparency. Please treat everyone with respect. Healthy debates are natural, but kindness is required.
No Hate Speech
Make sure everyone feels safe. Hate speech of any kind is strictly prohibited. Degrading comments about things like race, religion, culture, sexual orientation, etc. will not be tolerated.
No Promotions or Spam
Give more than you take. Self-promotion, spam, or links of any kind are not allowed.


